T: 020 8988 0370

St Pancras – Renaissance Hotel

Date Completed: 2011


St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

St Pancras – Renaissance Hotel

Rosemount’s skill and dedication to the carpet industry culminated in being invited by Brinton's to work alongside them measuring and planning the most prestigious contract awarded in 2011. The main contractor was Galliford Try Plcand the design team were Chris Garrods.

In order for Brinton’s to manufacture this type of installation Rosemount Flooring were required to take accurate templates of all areas from flat landings to winders. This procedure insures that the border design meets at every transition. This also limits the amount of time our installers need to be onsite.The Renaissance Hotel is a Grade 1listed building and therefore protected. We were required to install the carpet with this in mind and so came up with a method in which we did not bond any adhesives or cause any damage to the 14th century sandstone sub straights.